Discover · Stage 1 of 3
Token Economics Sprint
An independent model of what your AI workloads will cost to run (per token, on rented cloud GPUs or on hardware you own) and the volume at which the cheapest option changes. Built by the team before capacity is ordered, and handed over to you at the end.
The model is supplier-neutral: choosing a supplier, accelerator and configuration is your decision; continuing to buy tokens is an allowed answer; and we don't resell the hardware, cloud or licenses we recommend.
Start here if:
You have a named, owned use case and are about to order capacity for it.
The Sprint takes a use case a Discovery Sprint has already named and given an owner, and produces the cost case a Proof-of-Value is then run against.
- Duration2 weeks
- Pricing through your partners or on a call.
What you get
Workload inventory
Every workload, its type and its owner.
Your current AI bill
Metered, rented and owned, itemized as it stands today.
A written report
The range and conditions, a method appendix, and every number sourced.
The working model
Runnable by your finance team: change an input and see the answer change.
Infrastructure sizing
Accelerators, nodes, and network and storage bandwidth, supplier-neutral.
Scenario cards
Two to four one-page illustrations of the sizing in practice. Real quotes can sit beside them.
Executive readout
AI cost trends and the choice between metered, rented and owned.
Infrastructure readout
The detailed cost comparison for this workload, for your infrastructure team.
One of the team's veteran data scientists, drawn from the twelve people who staff every stage. Meet the team →
Talk it through with the team
Book a consultation with the team.